Kitchen, April 2018

This project consisted of replacing the main level flooring, de-stippling the main floor ceiling and a complete replacement of the kitchen! After the old kitchen was removed, the flooring was pulled up from the foyer to the back of the house. New porcelain tile was laid at the entrance, and hardwood in the remaining areas. The stairs received a refresh as well; the entire railing was removed and replaced with a new one, and all the stairs were sanded and re-stained to match the new hardwood on the main floor. The kitchen cabinets are all custom made and painted, designed to the clients exact specifications. The kitchen features a double wall oven, full sized fridge, island double sink, gas cook top, and custom cut quartz counters. In order to hide any venting, piping and electrical in the original bulkhead, we designed and installed a custom furring and crown molding at the top of the cabinets to complete the look.