Bathroom, Nov 2017

This project was a complete remodel of a three piece main bathroom. The client wanted the bathtub removed and a shower installed in its place, along with having the floor redone, and new vanity and toilet. After removing the bathtub, we found some water damage that had to be removed. Once that was done, we rebuilt the area with Schluter waterproof products so there will never be an issue with water damage again. The floor was also covered in Schluter waterproof products before porcelain tile was laid. The new shower consists of subway tile with multiple glass tile accents, a niche, and shower control unit with rain shower head and separate wand.