Bathroom, Jan 2018

Our first bathroom of 2018! This was a complete remodel of an existing main bathroom which required demolition of the original shower and flooring. After demo was complete, we created the custom shower using Schluter waterproof products to ensure a long lasting waterproof seal. The bathroom sub-floor was also covered in Schluter products to protect it as well. Once preparations were complete, the shower and floor were tiled with premium porcelain tile. The shower was finished with a custom hydroslide glass door.