Bathroom, Dec 2017

A quick remodel of a small three piece main bathroom. All the old fixtures, bathtub, toilet, vanity and flooring were removed and replaced. A new bathtub and toilet was installed, along with a new, custom made cabinet, based on the size, features and color the client desired. New ceramic tiles were installed on the floor and walls of the shower to complete this project.