In just over four weeks we completed this basement with three piece bathroom renovation! Starting from a nearly blank slate, we built all walls and dropped the ceiling 1.5" in order to accommodate existing plumbing. The furnace room was insulated with noise dampening insulation as it acoustically affects all adjacent rooms since it is centrally located. The main room includes a swivel TV wall mount with multiple 4K HDMI and network connections that route to the electrical panel. The wall at the stairs was removed to make the hallway feel more open and was finished with a painted railing and newel post. Storage is located under the stairs and accessible via a full sized door. The ceramic tiled bathroom accommodates a new vanity, toilet and acrylic shower as well as space for the laundry facilities.